T0858: Change Operating Mode
Adversaries may change the operating mode of a controller to gain additional access to engineering functions such as Program Download. Programmable controllers typically have several modes of operation that control the state of the user program and control access to the controllers API. Operating modes can be physically selected using a key switch on the face of the controller but may also be selected with calls to the controllers API. Operating modes and the mechanisms by which they are selected often vary by vendor and product line. Some commonly implemented operating modes are described below:
* Program - This mode must be enabled before changes can be made to a devices program. This allows program uploads and downloads between the device and an engineering workstation. Often the PLCs logic Is halted, and all outputs may be forced off. [1] * Run - Execution of the devices program occurs in this mode. Input and output (values, points, tags, elements, etc.) are monitored and used according to the programs logic. Program Upload and Program Download are disabled while in this mode. [2] [3] [1] [4] * Remote - Allows for remote changes to a PLCs operation mode. [4] * Stop - The PLC and program is stopped, while in this mode, outputs are forced off. [3] * Reset - Conditions on the PLC are reset to their original states. Warm resets may retain some memory while cold resets will reset all I/O and data registers. [3] * Test / Monitor mode - Similar to run mode, I/O is processed, although this mode allows for monitoring, force set, resets, and more generally tuning or debugging of the system. Often monitor mode may be used as a trial for initialization. [2]
Security context for executives and security teams
T0858: Change Operating Mode describes Adversaries may change the operating mode of a controller to gain additional access to engineering functions such as Program Download. Programmable controllers typically have several modes of operation that control the state of the user program and control access to the controllers API. Operating modes can be physically selected using a key switch on the face of the controller but may also be selected with calls to the controllers API. Operating modes and the mechanisms by which they are selected often vary by vend...
Executive priority
T0858: Change Operating Mode is an official MITRE ATT&CK technique. Glexia treats it as defensive behavior context for prioritizing monitoring, control validation, and response planning without using the object by itself as an attribution claim.
Technical view
Security teams should validate T0858: Change Operating Mode by reviewing the official ATT&CK relationships, mapped tactics (execution, evasion), supported platforms (None), and available local telemetry before making detection or mitigation decisions.
Likely telemetry
- Official ATT&CK relationships and object metadata
- Endpoint process, command-line, and script execution logs
Detection direction
- Validate whether T0858: Change Operating Mode appears in your detection coverage and tabletop scenarios.
- Use the object to align executive risk language with SOC, incident response, and detection engineering work.
- Do not treat ATT&CK relationship context as attribution without corroborating evidence.
Mitigation priorities
- Map the object to existing controls and identify missing telemetry or response ownership.
- Prioritize mitigations that reduce exposure on the listed platforms and tactics.
- Review adjacent ATT&CK relationships before changing policy, detections, or reporting language.
Additional notes and limits
Baseline Glexia take generated from the official MITRE ATT&CK STIX object, source hash, tactics, platforms, and detection fields. It is safe to replace with a richer model-generated take for the same source hash later.
This baseline take is source-grounded and schema-validated, but it does not include environment-specific telemetry, incident evidence, or threat-intelligence corroboration.
Generated from the cited source records. This long-tail analysis has not been individually reviewed by a named human.
Change Operating Mode
Adversaries may change the operating mode of a controller to gain additional access to engineering functions such as Program Download. Programmable controllers typically have several modes of operation that control the state of the user program and control access to the controllers API. Operating modes can be physically selected using a key switch on the face of the controller but may also be selected with calls to the controllers API. Operating modes and the mechanisms by which they are selected often vary by vendor and product line. Some commonly implemented operating modes are described below:
* Program - This mode must be enabled before changes can be made to a devices program. This allows program uploads and downloads between the device and an engineering workstation. Often the PLCs logic Is halted, and all outputs may be forced off. [1] * Run - Execution of the devices program occurs in this mode. Input and output (values, points, tags, elements, etc.) are monitored and used according to the programs logic. Program Upload and Program Download are disabled while in this mode. [2] [3] [1] [4] * Remote - Allows for remote changes to a PLCs operation mode. [4] * Stop - The PLC and program is stopped, while in this mode, outputs are forced off. [3] * Reset - Conditions on the PLC are reset to their original states. Warm resets may retain some memory while cold resets will reset all I/O and data registers. [3] * Test / Monitor mode - Similar to run mode, I/O is processed, although this mode allows for monitoring, force set, resets, and more generally tuning or debugging of the system. Often monitor mode may be used as a trial for initialization. [2]
How security teams should use this page
Treat this object as behavior context, not an attribution claim. Validate the related groups, software, data sources, and mitigations against official ATT&CK relationships and your own telemetry before making control-coverage decisions.
Groups, software, and campaigns
S1006: PLC-Blaster
PLC-Blaster is a piece of proof-of-concept malware that runs on Siemens S7 PLCs. This worm locates other Siemens S7 PLCs on the network and attempts to infect them. Once this worm has infected its target and attempted to infect other devices on the network, the worm can then run one of many modules. [1] [2]
S1009: Triton
S1045: INCONTROLLER
INCONTROLLER is custom malware that includes multiple modules tailored towards ICS devices and technologies, including Schneider Electric and Omron PLCs as well as OPC UA, Modbus, and CODESYS protocols. INCONTROLLER has the ability to discover specific devices, download logic on the devices, and exploit platform-specific vulnerabilities. As of September 2022, some security researchers assessed INCONTROLLER was developed by CHERNOVITE.[1][2][3][4][5]
All related ATT&CK context
Mitigation direction
Object version and sync metadata
The fields below describe the current mirrored snapshot. When Glexia retains multiple ATT&CK source imports, you can open the table to compare the same object across releases (hashes and MITRE timestamps). For MITRE’s own release notes and roadmap, see ATT&CK resources — Updates.
Imported snapshots across ATT&CK releases(2)
| Release | Bundle imported | Object version | Modified | Status | Raw hash |
|---|---|---|---|---|---|
| 19.2 | 1.0 | Current bundle | 18305da65faa… | ||
| 19.1 | 1.0 | Older bundle | 18305da65faa… |
Mirrored ATT&CK source object
The raw object is retained through the mirrored ATT&CK source bundle and object hash. The raw endpoint returns the exact object from the mirrored bundle when available.
External references and citations
MITRE external references are preserved separately from Glexia analysis so citations remain traceable to their original source records.
- [1]N.A. October 2017
N.A. 2017, October What are the different operating modes in PLC? Retrieved. 2021/01/28
Open source URL - [2]Omron
Omron Machine Information Systems 2007 How PLCs Work Retrieved. 2021/01/28 PLC Different Operating Modes Retrieved. 2021/01/28
Open source URL - [3]Machine Information Systems 2007
Machine Information Systems 2007 How PLCs Work Retrieved. 2021/01/28
- [4]PLCgurus 2021
PLCgurus 2021 PLC Basics Modes Of Operation Retrieved. 2021/01/28
Open source URL - [5]mitre-attackT0858Open source URL
Source: MITRE ATT&CK®. © 2026 The MITRE Corporation. This work is reproduced and distributed with the permission of The MITRE Corporation. MITRE ATT&CK and ATT&CK are registered trademarks of The MITRE Corporation. Glexia is not affiliated with or endorsed by MITRE.
